As part of the Brandon Avenue District project, we helped UVA redevelop 14 acres adjacent to both the academic and health system grounds as a vibrant mixed-use district. The development included a new signature street design with a bioretention median that would treat the entire district’s stormwater needs. In addition, new central utility infrastructure was extended to serve six new buildings, including chilled water, storm sewer, sanitary sewer, domestic water, low temperature hot water, a medium temperature hot water to low temperature hot water conversion hub, electrical ductbank, and communication service.
www.dewberry.com